Monday, September 8, 2014

Team Hydra's First Project

Hydra Bridge, at 51.5 cm



Team Hydra's first project! It's 51.5 cm. Its connected using simple slits between each piece. The original design was to be a slide, but we didn't have enough time. Me, Austyn Coffil, Austin Adams, and Ganesh Ramakrishnan worked on it. It spent a lot of time in the concept and brainstorming phase, so we barely did any testing. However, we had a lot of teamwork, so we had a lot of fun. We could have folded the edges to create walls to keep the balls from touching the table. Only by brainstorming we created this design. 

No comments:

Post a Comment